FAQ
Can I use it in the field?
Yes. Designed for real commissioning environments.
How does PASS / FAIL work?
PASS / FAIL is calculated using the technical parameters defined before Finalize.
Can I change results after Finalize?
No. Finalize locks both the test and the report.
Can I email the report directly?
Yes. Reports can be sent immediately after finalization.
Is the report editable?
No. The final report is generated once and locked.
Do I need to configure anything?
No setup required to start.
How do I track commissioning progress?
Progress is calculated from certified tests tied to assets — so “% complete” reflects deliverable readiness, not manual updates.