Continuity
Ensures an uninterrupted conductive path exists.
Explore electrical and mechanical tests used in real commissioning projects across infrastructure, data centers and industrial systems.
These tests represent common commissioning procedures used to verify installation quality, system performance and operational readiness.
Commissioning tests are used to verify installation quality, system performance and operational readiness in complex infrastructure projects. These procedures are commonly applied in environments such as data centers, tunnels, parking ventilation systems and industrial facilities.
Electrical tests verify installation integrity, safety and electrical continuity before energization.
Ensures an uninterrupted conductive path exists.
Evaluates insulation by applying DC voltage and reading MΩ/GΩ.
Measures mΩ in joints and contacts to detect false supports.
Verifies terminal tightness according to specified torque.
Micro-ohm measurement of busbars, joints, and power connections.
Mechanical tests verify airflow performance, mechanical stability and correct operation of rotating equipment.
Verifies that a jet fan delivers the designed airflow during commissioning.
Confirms that the jet fan rotates in the correct direction for the designed airflow pattern.
Measures vibration to ensure the jet fan operates within acceptable mechanical limits.
Validates that fan power consumption matches expected operating conditions.
Verifies that piping systems and pressurized equipment safely withstand design pressure.
Confirms that systems maintain vacuum conditions without air infiltration.
Detects leaks in sealed systems under pressure or vacuum conditions.
Verifies that systems deliver the required airflow or fluid flow according to design conditions.
Confirms that control valves move correctly across the full operating range.
Functional tests verify control logic, system response and operational sequences.
Confirms that interlocks block or allow operation exactly as defined by the sequence.
Verifies that the control sequence executes in the intended order under commissioning conditions.
Validates that alarms trigger, display, and clear according to the defined operating logic.
Use the catalog to explore the scope, then talk to us about how Statria turns execution, evaluation and certification into a delivery control system.